Vol. XVIII · Free shipping $75+ · Read the collection
Feature · Product Review

DOSATRON D3GL2BP Mineral buildup and lockout are

DOSATRON D3GL2BP Mineral buildup and lockout areDosatron with integrated by pass system for manual activation of the additive suction (on) and stop (off). Injection range 0,2 2 % [1: 500 1: 50] Water flow range 10 l h 3 m3 h Operating water pressure 0,3 6 bar Concentrated additive injection 0,02 l h 60 l h Stroke volume ~ 0,53 l Connections NPT BSP 20x27 3 4"M Hose PVC 8x12 Lg 1,75m

SKU: 892916200 · From iglepidom.org

4.8
USD299.00 USD344.00

Pay in 4 interest-free payments of $74.75 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 4 - Aug 9

Description

Mineral buildup and lockout are major causes of nutrient deficiencies - solve these issues with Athena Cleanse

Data Record Note: The HCS-1 can record the data coming in from the sensors onto a CSV file

the ECS-5 comes with a 16ft RJ12 cable

Foliar Spray:Mix 7ml per gallon water and spray thoroughly once weekly

DOSATRON D3GL2BP Mineral buildup and lockout areDosatron with integrated by pass system for manual activation of the additive suction (on) and stop (off). Injection range 0,2 2 % [1: 500 1: 50] Water flow range 10 l h 3 m3 h Operating water pressure 0,3 6 bar Concentrated additive injection 0,02 l h 60 l h Stroke volume ~ 0,53 l Connections NPT BSP 20x27 3 4"M Hose PVC 8x12 Lg 1,75m

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products